Steel Fibre Performance Testing Concrete Trial Report Client: The Straight Wire Pty Ltd Report Date: 30th June 2023
Made in China, Tianjin
Manufacturing lead time is 3-4 weeks, leaving well enough time for potential job starting in three months requiring around 60 T or above of end hooked fibres 60 mm long, 0.9 mm with 1800 MPa
Comments